The recommended cavity wall installation method for ISOBOARD®. Walls are constructed, leading with the initial 1.4m of inner leaf
containing the first two rows of wall ties, spaced 600mm apart.
Space the cavity ties (to building code standards), with holding back ties in between, to be embedded as per building standards.
Board support ties to be 2mm galvanised wire with fish-tail ends.Excess mortar to be cleaned from the cavity face of the leading leaf.
The initial two rows of ISOBOARD® sheets are placed on edge against the leading leaf with shiplap joint installed such as to shed moisture away from the inner leaf, or with tongue facing upwards and secured with the holding back ties.
A run of boards may commence below a damp-proof course level to provide some edge insulation for the floor.
ISOBOARD® can be placed in a potentially damp position without losing thermal performance in the long term.
Construct the outer leaf taking care to keep the residual cavity clean and secure the cavity ties. Please note that the construction of a cavity wall with insulation requires competent supervision, to ensure that the cavity is cleaned and the cavity ties properly secured.