HIGH QUALITY THERMAL INSULATION WITH UNIQUE PROPERTIES


From Australian Urethane and Styrene Pty Ltd
Stage 4 - Attaching the ISOBOARD
In order to maintain strength and durability the ISOBOARD® needs to be screwed into the timber frame, using large strong plastic washers as shown.

Stage 5 - Masking Windows
Stage 4-6
Stage 6 - Metal Edges (optional but recommended)

Australian Urethane and Styrene Pty Ltd

Inverted Roof Installation
Surface Bed Installation
Over Purlin Installation
Rendering
Stage 1-3
Stage 4-6
Stage 7-8
Finished Product
Tips and Guides
Cavity Wall Installation