Stage 8 - Applying fibre glass mesh

The fibreglass mesh is then applied directly onto the fresh base coat before base coat sets.

Stage 7-8

Australian Urethane and Styrene Pty Ltd

Inverted Roof Installation
Surface Bed Installation
Over Purlin Installation
Rendering
Stage 1-3
Stage 4-6
Stage 7-8
Finished Product
Tips and Guides
Cavity Wall Installation
Stage 7 - Apply base render coat
The first coat of render is applied directly over the board.