IsoboardIsoboard
Isoboard
  HomeProduct DataApplications & InstallationsProjectsContact Us

inverted roof installation

surface bed insulation

over purlin insulation

rendering

   

Stages 1-3

Stage 4-6

Stages 7 & 8

Finished Product

General Tips & Guides

cavity wall insulation

Welcome Visitor - Editor Login

Applications & Installations > rendering > Stage 4-6

Stage 4 - Attaching the ISOBOARD

In order to maintain strength and durability the ISOBOARD® needs to be screwed into the timber frame, using large strong plastic washers as shown.

Stage 5 - Masking Windows

     

Stage 6 - Metal Edges (optional but recommended)

It is recommended that metal X angle joints be attached to the ends of the walls, and even to window reveals, in order to create a strong and sharp edge, bonding the edges of the surface rendering and the end of the ISOBOARD®.

© 2008 Isoboard