IsoboardIsoboard
Isoboard
  HomeProduct DataApplications & InstallationsProjectsContact Us

inverted roof installation

surface bed insulation

over purlin insulation

rendering

   

Stages 1-3

Stage 4-6

Stages 7 & 8

Finished Product

General Tips & Guides

cavity wall insulation

Welcome Visitor - Editor Login

Applications & Installations > rendering > Stages 1-3

Stage 1 - Frame

Upon completion of the frame the ISOBOARD® is ready to be attached.

Stage 3 - Applying the Isoboard

Placing the ISOBOARD® on the wall is a matter of putting a correctly measured and cut piece in place.

The tongue and groove slide easily into one another to make a stronger joint.  If installing horizontally leave the tongue of the ISOBOARD® facing upward.

Using a strong adhesive in the grooves is also recommended in order to strengthen the already strong joints.

Notice how this unusually shaped piece fits easily into this difficult area of wall.

Stage 2 - Measuring and Cutting the ISOBOARD

ISOBOARD® is simple to install. Carefully mark the board with a pencil and cut with either handsaw or hot element. The ISOBOARD® can be attached either horizontally or vertically depending on wall sizes.

© 2008 Isoboard